Construction and Monitoring in the Longitudinal Direction Rectification of a Certain Dwelling Building in Shanghai
-
Abstract: With an engineening example,the principle of stress relieving method,the construction method and rectifying procedure control in longitudinal direction rectification are introduced.The feasibility of the rectification method in soft soil area such as Shanghai is presented.
-
Key words:
- rectification /
- stress relieving method /
- information construction
计量
- 文章访问数: 27
- HTML全文浏览量: 10
- PDF下载量: 4
- 被引次数: 0