摘要: 深圳市梧桐山下一居住小区,红线沿山脚全长558m,切削后预应力锚索加固面积9733 m2。工程竣工后经过五年考验,工程保持稳定完整、植被全面覆盖,工程实践是成功的。Abstract: A Practical engineering of enforcement of mountain slope excavation by prestressed strand is introduced,which records the whole project procedure from design to construction.The slope remains firm,complete and well covered by the vegetation since the construction was completed five years ago.The practice proves to be a successful experience.
-
Key words:
- enforcement of mountain slope /
- prestressed strand /
- afforestation /
- drainage