An case analysis of hand-dug pile foundation in Xiamen
-
Abstract: Based on the results of static load test and coring,a case of a hand-dug pile foundation is analyzed in this paper. The reasons of the quality defect of this pile foundation are discussed. Some proposals are presented finally.
-
Key words:
- hand dug pile /
- staticload test /
- coring /
- bearing stratum
计量
- 文章访问数: 34
- HTML全文浏览量: 8
- PDF下载量: 6
- 被引次数: 0