Some Porblems about the Determination of Anti-uplift Groundwater Level of Building Foundation
-
Abstract: The uplift pressure on building foundation is mainly controled by the groundwater level of the stratum sit by foundution.In the site with multi-level grounduater,the highest grourdwater level should be predicted layer by layer.
-
Key words:
- anti-uplift /
- annual variation /
- unexcepted supply
计量
- 文章访问数: 57
- HTML全文浏览量: 8
- PDF下载量: 14
- 被引次数: 0