-
Abstract: The design and construction of foundation pit supporting of Electricity Application Cener Plaza of Changzhou city is introduced, in which the technique of castinsitu bored pile, pressure grouting cofferdam and anchor rod is used.
计量
- 文章访问数: 37
- HTML全文浏览量: 8
- PDF下载量: 6
- 被引次数: 0