Abstract:
This paper introdaces the maximum posterior estimation into adjastment and design of closest mine networks for a large scale of holing through sorvey. This adjustment method is used to the data processing of this networks more properly than the quasi-weight adjustment because the overall adjosement solution of the connected parameters and the united accuracy datam may be obtained. The results of united and partial maximam posteripr adjastment are approximately equal is tested by a practical example.