The Constructional Technics of Post-inserted the Steel Reinforcement Cage in Bored Pile and Associated Equipment
-
Abstract: The constructional technology of forming the pi le first and then inserting the steel reinforcement cage in bored pile is intrud uced and the principal,function,feature and application range of the constructio nal technology and associated equipment are discussed.
计量
- 文章访问数: 60
- HTML全文浏览量: 10
- PDF下载量: 8
- 被引次数: 0