蓟县电厂主厂房场地的工程地质条件
-
摘要: 本文通过时蓟县电厂主厂房冲击钻孔灌注桩施工的监理,在详勘地质报告与实际不行的情况下,经少量的补勘工作,弄清了场地的地质条件;用冲击钻孔的岩渣判别基岩风化程度;对场地进行了工程地质分区,使桩基施工缩短了工期,节约了造价。经检测,桩基强度完全满足了设计要求。Abstract: Based on the monitoring to the construction of the percussion boring filling pile for the main building of the power plant in Ji county, the engineering geological conditions of the site were understood through a little supplement investigation in the case that the report of the detailed investigation isn't correspond to the practice, The weathering degree of the rock is decided by debris from percussion boring. And the site is delimited to different are as in engineering geology.