Analysis of Subgrade's Long-term Stability by AHP and Fuzzy Mathematics Method
-
摘要: 根据对一低液限粉土路基的现场工程地质调查及检测,确定了影响该路基长期稳定性的主要影响因素,并结合AHP法,应用两级模糊综合评判的方法对该路基的长期稳定性进行了评价。Abstract: According to engineer-geological investigation and detection on the silt subgrade with the low liquid limit, the major factors affecting the subgrade's long-term stability are defined and the fuzzy mathematics method combined with AHP are used to evaluate the subgrade's long-term stability.
-
Key words:
- subordinate degree /
- subordinate function /
- synthesis evaluation /
- grading criteria /
- subgrade stability
计量
- 文章访问数: 39
- HTML全文浏览量: 10
- PDF下载量: 7
- 被引次数: 0