13 000 kN Static-loading Test in the Ⅲ Sign Section of Cao River Flume Pile Foundation of South-to-North Water Transfer Project
-
摘要: 漕河渡槽是南水北调中线工程总干渠上的标志性建筑物,其Ⅲ标段渡槽基础采用桩基形式。桩基施工完毕后,为了检测单桩竖向抗压承载力,采用了以堆锚联合反力装置为反力方式的13 000 kN竖向抗压静载试验,实验结果分析表明,本工程单桩的竖向抗压承载力满足设计要求。Abstract: The flume at Cao River is an important building of the emergency water supply project for the Beijing-Shijiazhuang section on the Mid-Route of South-to-North Water Transfer Project. The Ⅲ sign section flume foundation uses pile foundation. In order to test the single pile vertical bearing capacity, 13000kN vertical static-loading experiment is done. The experimental result shows that the pile vertical compressive beating capacity satisfied the design requirements.