Analysis of the Foundation's Proposals for C07 Section in Hui longguang Area
-
摘要: 根据地质条件,对回龙观C0 7区地基方案进行了对比分析,介绍了CFG桩复合地基的设计、夯扩桩桩基的设计,根据地基变形的沉降观测结果,说明采用CFG桩复合地基和夯扩桩桩基方案合理。Abstract: According to the geological condition, the foundation's proposals of C07 section in Huilongguan area are analyzed,and the design of CFG piles composite foundation and ram-compactionpile foundation are introduced.Its rationality is proven by the result of foundation settlement.
计量
- 文章访问数: 25
- HTML全文浏览量: 3
- PDF下载量: 6
- 被引次数: 0