Abstract:
Based on some engineering examples, the usual excavation retaining methods and theirs application conditions of striped-soil foundation pit are introduced, the general engineering accidents of striped-soil foundation pit retaining are summarized, the corresponding solution methods are provided, and the basic reason of accident is pointed out that the adjacent foundation pit backfill contains high water content and under-consolidation. It can be used as the reference for similar project.