Abstract:
Gates Foundation introduced a pump displacement and steel pile supported retaining the force process, causing instability of the reasons for supporting a detailed analysis, design and construction process of excavation problems, introduced after the emergency shoring unstable, envelope reinforcement, reinforcement and support system impervious reinforcement measures, while disposal of reinforcement reinforcing effects are analyzed, draw relevant conclusions and recommendations for similar pit provided some basis for the smooth construction.