摘要: 同家建筑标准设计图集11SG814《建筑基坑支护结构构造》中,第30、31页介绍的关于灌注桩排桩桩间土连续防护构造做法有3种。通过某在建工程的应用实例的对比分析,得出在进行相关基坑围护结构设计与施工时,应根据现场实际需要选取既经济可行又经济合理的做法,在保证施工质量与安全条件下,做到节约造价同时获得良好收益。Abstract: Three protective structure practice between retaining piles about building construction excavation structure are described on page 30,31 in the national Building Standard Design Atlas 11SG814.Several application examples are introduced to compare and analyze the problem of which is the best way.It is concluded that retaining structure design and construction should be selected according to the actual needs both economically feasible and economically reasonable approach,so that the cost savings and good yields effects will be realized to ensure the construction quality and safety conditions.