Design and Practice of High Mountain Slope Engineering in Rail Transit Parking Lot
-
摘要: 以某城市轨道交通停车场建设项目为例,介绍了碎块状强风化砂岩超高山体边坡工程设计要点。该项目为地下停车场,埋深约13 m,停车场与边坡支护结构相分离,边坡最大高度55.0 m,综合考虑场地地层以及周边环境要求,边坡支护采用桩锚+锚杆格构梁的支护方案。项目实施过程中对边坡进行全过程监测,监测结果表明,该支护方案合理安全,可供类似工程参考。Abstract: Taking an urban rail transit parking lot construction project as an example, the key points of the engineering design of the fragmented strongly weathered sandstone super-mountain slope are introduced. The project is an underground parking lot with a buried depth of about 13 m. The parking lot is separated from the slope support structure and the maximum height of the slope is 55.0 m. Considering the requirements of the ground and surrounding environment, the support scheme of pile anchor + anchor bar lattice beam is adopted for slope support. During the implementation of the project, the whole process of slope monitoring is carried out. The monitoring results show that the support scheme is reasonable and safe, which can be used as reference for similar projects.
-
Key words:
- high slope /
- highly weathered sandstone /
- slope design /
- parking lot
-
表 1 南侧边坡典型剖面锚索参数表
锚索位置 入射角度/(°) 锚索配筋 锚索总长/m 锚固段长度/m 自由段长度/m 轴力标准值/kN 轴力设计值/kN 锁定值/kN 第一道 15 4根钢绞线 20.5 13.0 7.5 340 510 305 第二道 15 4根钢绞线 18.5 12.5 6.0 335 500 300 第三道 15 4根钢绞线 14.5 9.5 5.0 255 380 230 表 2 不同工况下边坡稳定安全系数计算表
工况 总下滑力/kN 总抗滑力/kN 最小安全系数 一般工况 19547.537 29673.920 1.518>1.35 地震工况 20395.221 29174.783 1.430>1.15 -
[1] 乔 翔. 高速公路高路堑边坡失稳诱因分析及综合处治技术研究[J]. 公路,2017,8(8):57-61. [2] 徐 伟,孙巍锋,王 瑞,等. 公路路堑边坡施工问题及对策探讨[J]. 公路,2019,64(11):33-39. [3] 杨 超,王 凯,曹运江,等. 浙江高速公路边坡病害调查及处治措施研究[J]. 公路,2019,64(3):259-265. [4] 廖小平. 类土质路堑边坡变形破坏类型及稳定性分析[J]. 岩石力学与工程学报,2003,22(S2):2765-2772. [5] 魏 伟,陈元勇. 营坪路土质边坡稳定性评价及工程治理[J]. 四川建材,2021,47(2):63-64. [6] 眭素刚,许汉华,武凯强. 昆明市富民县某边坡稳定性分析及治理措施[J]. 中国水运(下半月),2021,21(2):137-138. [7] CHEN L H,NING Z,XU L,et al. Comparison between baseline technique design and partial factor design in slope engineering[J]. Bulletin of Engineering Geology and the Environment,2021,(80):3351-3364. [8] LI Z Z,XUE F F,ZHENG C C,et al. Evaluation of the effects of protective measures implemented in high-rockfill slope engineering based on the discrete element model[J]. IOP Conference Series: Earth and Environmental Science,2021,643(1):012154. [9] 周德培. 软岩高边坡工程的信息施工[J]. 岩石力学与工程学报,1999,8(4):373-377. [10] 孙书伟,马惠民,张忠平. 高边坡动态设计思路及工程应用−以安徽铜陵–黄山高速公路某高边坡为例[J]. 中国地质灾害与防治学报,2008,3(19):73-77. [11] 肖世国,周德培. 岩石高边坡的动态设计施工模式[J]. 岩石力学与工程学报,2002,9(9):1372-1374. doi: 10.3321/j.issn:1000-6915.2002.09.019 [12] 汪益敏,王兆阳,李 奇,等. 粉砂岩路堑高边坡施工监测与动态设计[J]. 中南大学学报(自然科学版),2019,50(2):400-408. doi: 10.11817/j.issn.1672-7207.2019.02.020 [13] 侯慧珍. 抗滑桩在边坡工程中的设计与应用[J]. 建材发展导向,2021,19(8):64-65. [14] 化建新, 郑建国. 工程地质手册(第五版)[M]. 北京: 中国建筑工业出版社, 2018. [15] GB 50330—2013建筑边坡工程技术规范[S]. 北京: 中国建筑工业出版社, 2013. [16] 彭鹏铭. 公路高边坡工程中预应力锚索技术施工工艺分析[J]. 工程技术研究,2020,5(23):60-61. doi: 10.3969/j.issn.1671-3818.2020.23.025