Citation: | Liu Xiujun. Softening characteristics of anchorage interface in the fully grouted anchorage system[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2025, 39(1): 14-24. doi: 10.20265/j.cnki.issn.1007-2993.2023-0783 |
[1] |
王卫东, 李永辉, 吴江斌. 超长灌注桩桩–土界面剪切模型及其有限元模拟[J]. 岩土力学,2012,33(12):3818-3824,3832. (WANG W D, LI Y H, WU J B. Pile-soil interface shear model of super long bored pile and its FEM simulation[J]. Rock and Soil Mechanics,2012,33(12):3818-3824,3832. (in Chinese)
WANG W D, LI Y H, WU J B. Pile-soil interface shear model of super long bored pile and its FEM simulation[J]. Rock and Soil Mechanics, 2012, 33(12): 3818-3824,3832. (in Chinese)
|
[2] |
曹文贵, 王江营, 翟友成. 考虑残余强度影响的结构面与接触面剪切过程损伤模拟方法[J]. 土木工程学报,2012,45(4):127-133. (CAO W G, WANG J Y, ZHAI Y C. Study of simulation method for the shear deformation of rock structural planes and interfaces with consideration of residual strength[J]. China Civil Engineering Journal,2012,45(4):127-133. (in Chinese)
CAO W G, WANG J Y, ZHAI Y C. Study of simulation method for the shear deformation of rock structural planes and interfaces with consideration of residual strength[J]. China Civil Engineering Journal, 2012, 45(4): 127-133. (in Chinese)
|
[3] |
黄明华. 岩土锚杆拉拔荷载传递分析与FRP智能锚杆监测验证[D]. 哈尔滨: 哈尔滨工业大学, 2014. (HUANG M H. Analysis on pullout load transfer mechanism of geotechnical anchor and its validating monitor with smart FRP anchor[D]. Harbin: Harbin Institute of Technology, 2014. (in Chinese)
HUANG M H. Analysis on pullout load transfer mechanism of geotechnical anchor and its validating monitor with smart FRP anchor[D]. Harbin: Harbin Institute of Technology, 2014. (in Chinese)
|
[4] |
CAI Y, ESAKI T, JIANG Y J. A rock bolt and rock mass interaction model[J]. International Journal of Rock Mechanics and Mining Sciences,2004,41(7):1055-1067. doi: 10.1016/j.ijrmms.2004.04.005
|
[5] |
尤春安, 战玉宝, 刘秋媛, 等. 预应力锚索锚固段的剪滞–脱黏模型[J]. 岩石力学与工程学报,2013,32(4):800-806. (YOU C A, ZHAN Y B, LIU Q Y, et al. Shear lag-debonding model for anchorage section of prestressed anchor cable[J]. Chinese Journal of Rock Mechanics and Engineering,2013,32(4):800-806. (in Chinese) doi: 10.3969/j.issn.1000-6915.2013.04.019
YOU C A, ZHAN Y B, LIU Q Y, et al. Shear lag-debonding model for anchorage section of prestressed anchor cable[J]. Chinese Journal of Rock Mechanics and Engineering, 2013, 32(4): 800-806. (in Chinese) doi: 10.3969/j.issn.1000-6915.2013.04.019
|
[6] |
BENMOKRANE B, CHENNOUF A, MITRI H S. Laboratory evaluation of cement-based grouts and grouted rock anchors[J]. International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts,1995,32(7):633-642.
|
[7] |
REN F F, YANG Z J, CHEN J F, et al. An analytical analysis of the full-range behaviour of grouted rockbolts based on a tri-linear bond-slip model[J]. Construction and Building Materials,2010,24(3):361-370. doi: 10.1016/j.conbuildmat.2009.08.021
|
[8] |
LIU X J, MA Z G. Mechanical behavior analysis of fully grouted bolt under axial load[J]. Scientific Reports,2023,13(1):421. doi: 10.1038/s41598-023-27673-6
|
[9] |
MA S Q, ZHAO Z Y, NIE W, et al. An analytical model for fully grouted rockbolts with consideration of the pre- and post-yielding behavior[J]. Rock Mechanics and Rock Engineering,2017,50(11):3019-3028. doi: 10.1007/s00603-017-1272-5
|
[10] |
MALVAR L J. Bond of reinforcement under controlled confinement[J]. Materials Journal,1992,89(6):593-601.
|
[11] |
MOOSAVI M, KHOSRAVI A, JAFARI A. A laboratory study of bond failure mechanism in deformed rock bolts using a modified hoek cell[C]//Proceedings of the ISRM International Symposium - 2nd Asian Rock Mechanics Symposium. Beijing, China: ISRM, 2001.
|
[12] |
刘 波, 李东阳, 段艳芳, 等. 锚杆–砂浆界面黏结滑移关系的试验研究与破坏过程解析[J]. 岩石力学与工程学报,2011,30(S1):2790-2797. (LIU B, LI D Y, DUAN Y F, et al. Experimental study of bong-slip relationship between bolt and mortar and theoretical solution to failure process[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(S1):2790-2797. (in Chinese)
LIU B, LI D Y, DUAN Y F, et al. Experimental study of bong-slip relationship between bolt and mortar and theoretical solution to failure process[J]. Chinese Journal of Rock Mechanics and Engineering, 2011, 30(S1): 2790-2797. (in Chinese)
|