Citation: | Wang Huinian, Kang Bo, Xie Enlin, Li Pengfei, Pang Yuekui, Li Bing. Influence caused by reinforcement range of connecting passage on main tunnels[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2025, 39(1): 25-34. doi: 10.20265/j.cnki.issn.1007-2993.2024-0252 |
[1] |
卫佳莺, 马永政, 莫振泽, 等. 机械法联络通道T接施工地层隆沉变化特征研究——以无锡地铁3号线顶管法联络通道T接施工示范工程为例[J]. 隧道建设(中英文),2020,40(S2):136-143. (WEI J Y, MA Y Z, MO Z Z, et al. Study on influence of ground settlement in T-joint connecting passage with mechanical pipe jacking method: With the example of the demonstration project of T-joint construction of connecting passage with pipe jacking method in Wuxi Metro Line 3[J]. Tunnel Construction,2020,40(S2):136-143. (in Chinese)
WEI J Y, MA Y Z, MO Z Z, et al. Study on influence of ground settlement in T-joint connecting passage with mechanical pipe jacking method: With the example of the demonstration project of T-joint construction of connecting passage with pipe jacking method in Wuxi Metro Line 3[J]. Tunnel Construction, 2020, 40(S2): 136-143. (in Chinese)
|
[2] |
胡 威, 黄 强, 李海波, 等. 机械法联络通道施工对T接部位沉降影响的实测与数值分析[J]. 施工技术(中英文),2022,51(13):68-74,80. (HU W, HUANG Q, LI H B, et al. Actual measurement and numerical analysis of influence of mechanical connection channel construction on settlement of T-junction[J]. Construction Technology,2022,51(13):68-74,80. (in Chinese)
HU W, HUANG Q, LI H B, et al. Actual measurement and numerical analysis of influence of mechanical connection channel construction on settlement of T-junction[J]. Construction Technology, 2022, 51(13): 68-74,80. (in Chinese)
|
[3] |
丁剑敏, 董子博, 莫振泽, 等. 顶管法T接隧道现场试验研究分析[J]. 隧道建设(中英文),2020,40(1):28-34. (DING J M, DONG Z B, MO Z Z, et al. Field Experimental study on t-connected tunnel with pipe jacking method[J]. Tunnel Construction,2020,40(1):28-34. (in Chinese)
DING J M, DONG Z B, MO Z Z, et al. Field Experimental study on t-connected tunnel with pipe jacking method[J]. Tunnel Construction, 2020, 40(1): 28-34. (in Chinese)
|
[4] |
刘明高, 马连友, 陆 平, 等. 超大直径盾构隧道机械法施工联络通道结构力学响应分析[J]. 特种结构,2021,38(5):106-111. (LIU G M, MA L Y, LU P, et al. Structural mechanical response impact of cross-passages mechanical construction on super-large diameter shield tunnel[J]. Special Structures,2021,38(5):106-111. (in Chinese)
LIU G M, MA L Y, LU P, et al. Structural mechanical response impact of cross-passages mechanical construction on super-large diameter shield tunnel[J]. Special Structures, 2021, 38(5): 106-111. (in Chinese)
|
[5] |
赵泽昌, 霍永鹏, 李河山, 等. 机械法开挖地铁联络通道的施工力学响应分析[J]. 市政技术,2022,40(1):1-6. (ZHAO Z C, HUO Y P, LI H S, et al. Analysis of mechanical response of metro connecting channel by mechanical construction[J]. Municipal Engineering Technology,2022,40(1):1-6. (in Chinese)
ZHAO Z C, HUO Y P, LI H S, et al. Analysis of mechanical response of metro connecting channel by mechanical construction[J]. Municipal Engineering Technology, 2022, 40(1): 1-6. (in Chinese)
|
[6] |
张 磊, 李 帆, 张秉鹤, 等. 机械法联络通道主隧道特殊管片结构安全性数值分析[J]. 施工技术(中英文),2022,51(10):29-34. (ZHANG L, LI F, ZHANG B H, et al. Numerical analysis on safety of special segment structure of main tunnel in mechanical connecting aisle[J]. Construction Technology,2022,51(10):29-34. (in Chinese)
ZHANG L, LI F, ZHANG B H, et al. Numerical analysis on safety of special segment structure of main tunnel in mechanical connecting aisle[J]. Construction Technology, 2022, 51(10): 29-34. (in Chinese)
|
[7] |
朱瑶宏, 高一民, 董子博, 等. 盾构法T接隧道结构受力现场试验研究——以宁波轨道交通3号线联络通道为例[J]. 隧道建设(中英文),2019,39(11):1759-1768. (ZHU Y H, GAO Y M, DONG Z B, et al. Field test on structural mechanism of T-connected shield tunnel: a case study of connecting passage on Ningbo Metro Line No. 3[J]. Tunnel Construction,2019,39(11):1759-1768. (in Chinese)
ZHU Y H, GAO Y M, DONG Z B, et al. Field test on structural mechanism of T-connected shield tunnel: a case study of connecting passage on Ningbo Metro Line No. 3[J]. Tunnel Construction, 2019, 39(11): 1759-1768. (in Chinese)
|
[8] |
王 军, 李海峰, 李克金, 等. 盾构隧道联络通道钢管片快速开口施工技术研究[J]. 隧道建设(中英文),2021,41(S2):551-557. (WANG J, LI H F, LI K J, et al. Rapid opening technology of steel pipe sheet for connecting gallery of shield tunnel[J]. Tunnel Construction,2021,41(S2):551-557. (in Chinese)
WANG J, LI H F, LI K J, et al. Rapid opening technology of steel pipe sheet for connecting gallery of shield tunnel[J]. Tunnel Construction, 2021, 41(S2): 551-557. (in Chinese)
|
[9] |
张付林, 刘正好, 朱瑶宏, 等. 机械法联络通道T接部位受力特性及弱化分析[J]. 岩土工程学报,2022,44(S2):116-119. (ZHANG F L, LIU Z H, ZHU Y H, et al. Stress characteristics and weakening analysis of T-joint of connection passage by mechanical excavation method[J]. Chinese Journal of Geotechnical Engineering,2022,44(S2):116-119. (in Chinese)
ZHANG F L, LIU Z H, ZHU Y H, et al. Stress characteristics and weakening analysis of T-joint of connection passage by mechanical excavation method[J]. Chinese Journal of Geotechnical Engineering, 2022, 44(S2): 116-119. (in Chinese)
|
[10] |
杨佳栋, 郑荣跃, 郑诗怡, 等. 机械法联络通道T接部位接收端切削模型试验研究[J]. 施工技术(中英文),2022,51(3):12-17. (YANG J D, ZHENG R Y, ZHENG S Y, et al. Experimental study on cutting model of receiving end of T-joint part of mechanical connection channels[J]. Construction Technology,2022,51(3):12-17. (in Chinese)
YANG J D, ZHENG R Y, ZHENG S Y, et al. Experimental study on cutting model of receiving end of T-joint part of mechanical connection channels[J]. Construction Technology, 2022, 51(3): 12-17. (in Chinese)
|
[11] |
顾沉颖. NOMJS联络通道施工新工艺研究[J]. 隧道建设,2015,35(7):716-720. (GU C Y. NOMJS: A new technology for construction of connection passages of shield-bored tunnels[J]. Tunnel Construction,2015,35(7):716-720. (in Chinese) doi: 10.3973/j.issn.1672-741X.2015.07.016
GU C Y. NOMJS: A new technology for construction of connection passages of shield-bored tunnels[J]. Tunnel Construction, 2015, 35(7): 716-720. (in Chinese) doi: 10.3973/j.issn.1672-741X.2015.07.016
|
[12] |
柳 献, 郭振坤, 伍鹏李, 等. 通道开口对超大直径盾构法车站结构力学行为影响研究及结构优化[J]. 土木工程学报,2021,54(7):114-122. (LIU X, GUO Z K, WU P L, et al. Study on influence of passage opening on the mechanical behavior of super large diameter shield tunnel station structure and structural optimization[J]. China Civil Engineering Journal,2021,54(7):114-122. (in Chinese)
LIU X, GUO Z K, WU P L, et al. Study on influence of passage opening on the mechanical behavior of super large diameter shield tunnel station structure and structural optimization[J]. China Civil Engineering Journal, 2021, 54(7): 114-122. (in Chinese)
|
[13] |
王 龙. 盾构隧道与联络通道交叉部位管片力学行为研究[D]. 石家庄: 石家庄铁道大学, 2018. (WANG L. The mechanical behavior study of intersecting segment of shield tunnel and contact channel[D]. Shijiazhuang: Shijiazhuang Railway University, 2018. (in Chinese)
WANG L. The mechanical behavior study of intersecting segment of shield tunnel and contact channel[D]. Shijiazhuang: Shijiazhuang Railway University, 2018. (in Chinese)
|
[14] |
LU P, YUAN D J, JIN D L, et al. Centrifugal model tests on the structural response of the shield tunnel when constructing cross passages by mechanical methods[J]. Tunnelling and Underground Space Technology,2022,128:104621. doi: 10.1016/j.tust.2022.104621
|
[15] |
张明聚, 康 博, 李鹏飞, 等. 反拉式顶管法施工联络通道对地铁盾构隧道力学性能影响[J]. 隧道建设(中英文),2024,44(6):1165-1173. (ZHANG M J, KANG B, LI P F, et al. Influence of cross-passage construction using front-traction pipe jacking method on mechanical properties of metro shield tunnel[J]. Tunnel Construction,2024,44(6):1165-1173. (in Chinese)
ZHANG M J, KANG B, LI P F, et al. Influence of cross-passage construction using front-traction pipe jacking method on mechanical properties of metro shield tunnel[J]. Tunnel Construction, 2024, 44(6): 1165-1173. (in Chinese)
|