LI Fang, WANG Hongwei. New Construction Methods in the Consolidation and Enlargement of -4. 5m Long Yan Port of Xixiakou[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2010, 24(1): 10-11. doi: 10.3969/j.issn.1007-2993.2010.01.003
Citation:
LI Fang, WANG Hongwei. New Construction Methods in the Consolidation and Enlargement of -4. 5m Long Yan Port of Xixiakou[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2010, 24(1): 10-11. doi: 10.3969/j.issn.1007-2993.2010.01.003
LI Fang, WANG Hongwei. New Construction Methods in the Consolidation and Enlargement of -4. 5m Long Yan Port of Xixiakou[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2010, 24(1): 10-11. doi: 10.3969/j.issn.1007-2993.2010.01.003
Citation:
LI Fang, WANG Hongwei. New Construction Methods in the Consolidation and Enlargement of -4. 5m Long Yan Port of Xixiakou[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2010, 24(1): 10-11. doi: 10.3969/j.issn.1007-2993.2010.01.003
The thesis, taking the construction work of the consolidation and enlargement of -4.5 m Long Yan Port as an example, elaborates on the feasibility and the method of using the triple-pipe jet grouting pile as the bottom-holder, reinforced pile, together with the anchored steel pipe pile in port construction work, so as to provide certain experience and reference for similar projects.