Volume 25 Issue 6
Jul.  2021
Turn off MathJax
Article Contents
Zhang Wu, Liu Shaowen, Bian Wenfei. Design and Construction of Burity Ultimo Pits in Luanda[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2011, 25(6): 316-320. doi: 10.3969/j.issn.1007-2993.2011.06.011
Citation: Zhang Wu, Liu Shaowen, Bian Wenfei. Design and Construction of Burity Ultimo Pits in Luanda[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2011, 25(6): 316-320. doi: 10.3969/j.issn.1007-2993.2011.06.011

Design and Construction of Burity Ultimo Pits in Luanda

doi: 10.3969/j.issn.1007-2993.2011.06.011
  • Received Date: 2011-10-08
  • It's described that the design concept and construction process of a building pit which sites in Luanda,the capital of Angolan. The example shows that structure surface area and building site area ratio 92.5% by the combination of nail and anchor supporting structure. Utilizing the feature of the pit side soil appropriately, the pit excavation depth is more than 14m with vertical slop, and has little no dangerous on normal function and structural safety of dwelling houses which is from the pit at the edge of 0.3~0.5m.The maximum horizontal displacement of the pit can be observed is less than 3mm, The supporting structure endured repeated heavy rains, and its safe periods are past 2 years.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (27) PDF downloads(5) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return