Zhu Yanbing, Zhou Xiaohua, Liao Shaoming. Preliminary Study of Equivalent Depth Calculation in Pit Retaining[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2012, 26(2): 65-69. doi: 10.3969/j.issn.1007-2993.2012.02.003
Citation: Zhu Yanbing, Zhou Xiaohua, Liao Shaoming. Preliminary Study of Equivalent Depth Calculation in Pit Retaining[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2012, 26(2): 65-69. doi: 10.3969/j.issn.1007-2993.2012.02.003

Preliminary Study of Equivalent Depth Calculation in Pit Retaining

doi: 10.3969/j.issn.1007-2993.2012.02.003
  • Received Date: 2012-02-06
    Available Online: 2021-07-06
  • Problem of "pit in pit" (PIP)is a universal problem which hasn't been researched deeply. It is the realistic meaning for the PIP's equivalent conventional design. According to the rules of equivalent outer protective structure's maximum deformation, the feasibility of the equivalent method was studied. Through analyzing three important parameters:pit toe coefficient(χ), the area ratio of inside and outside(α), the depth ratio of inside and outside(β), a formulas is derived to calculate PIP's equivalent design depth.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (56) PDF downloads(6) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return