This research is based on a section of subway line parking excavation programs to optimize the designs. Excluding the using of comparison and selection methods to get the study area for the excavation of each program and relevant supporting design. Thus the use of mathematical methods for fuzzy evaluation composite score for all applicable programs and selecting the optimal solutions. After checking the design of the pit and using ADINA software to simulate, the author verify the feasibility of the final programs.