Volume 26 Issue 3
Jul.  2021
Turn off MathJax
Article Contents
Zheng Ping, Wu Xujun, Du Fuzhi. Technical Analysis on High-Rise Building Foundation Engineering Construction in Confined Aquifer[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2012, 26(3): 159-163. doi: 10.3969/j.issn.1007-2993.2012.03.013
Citation: Zheng Ping, Wu Xujun, Du Fuzhi. Technical Analysis on High-Rise Building Foundation Engineering Construction in Confined Aquifer[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2012, 26(3): 159-163. doi: 10.3969/j.issn.1007-2993.2012.03.013

Technical Analysis on High-Rise Building Foundation Engineering Construction in Confined Aquifer

doi: 10.3969/j.issn.1007-2993.2012.03.013
  • Received Date: 2012-03-06
    Available Online: 2021-07-06
  • The unfavorable effects of confined water were discussed briefly on the construction of foundation pit support, pile foundation and anti-float anchor (pile) for high-rise building. Combined with a engineering project, the design method of jet grouting cut-off wall in confined aquifer was elaborated. Key techniques, such as general construction sequence, treatment of gushing water in prospect hole and ground water--level observation, were also analysed in this Paper.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (33) PDF downloads(6) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return