Volume 26 Issue 4
Jul.  2021
Turn off MathJax
Article Contents
Ma Jian, Feng Keming. Application of Large Diameter Tube Well Dewatering in Subway Construction[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2012, 26(4): 204-207. doi: 10.3969/j.issn.1007-2993.2012.04.011
Citation: Ma Jian, Feng Keming. Application of Large Diameter Tube Well Dewatering in Subway Construction[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2012, 26(4): 204-207. doi: 10.3969/j.issn.1007-2993.2012.04.011

Application of Large Diameter Tube Well Dewatering in Subway Construction

doi: 10.3969/j.issn.1007-2993.2012.04.011
  • Received Date: 2012-04-18
    Available Online: 2021-07-06
  • As one of groundwater control measures, the lager diameter tube well dewatering is applied widely and ma turely. Because of the low criteria of construction admittance, and the little proportion in the construction cost, quality control is often ignored. It causes slope instability and bottom plate uplift frequently. It's necessary to design based on hydrological parameters from pumping test, control construction quality strictly for achieving satisfied effect.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (38) PDF downloads(6) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return