Volume 26 Issue 4
Jul.  2021
Turn off MathJax
Article Contents
Huang Luming, Tu Xiaofang, Liu Haisheng. Comprehensive Treatment Methods For Pile Construction of Application In City Areas[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2012, 26(4): 215-217. doi: 10.3969/j.issn.1007-2993.2012.04.014
Citation: Huang Luming, Tu Xiaofang, Liu Haisheng. Comprehensive Treatment Methods For Pile Construction of Application In City Areas[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2012, 26(4): 215-217. doi: 10.3969/j.issn.1007-2993.2012.04.014

Comprehensive Treatment Methods For Pile Construction of Application In City Areas

doi: 10.3969/j.issn.1007-2993.2012.04.014
  • Received Date: 2012-06-01
    Available Online: 2021-07-06
  • For the project DeShengMen Inside street in Beijing bridge pier construction process. Not only it meet the heavy traffic,narrow,overground and underground obstacles and many other conditions,but also,meet many Original river way Reinforcement material, Poor construction conditions and difficulty in construction is extremely high, and in various way, Measuring through eventually Solve these problems. For a completed bridge pier construction task, in my opinion, In the old city complex area construction, Comprehensive treatment measures consist better development space, Worth researching.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (23) PDF downloads(6) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return