Volume 26 Issue 5
Jul.  2021
Turn off MathJax
Article Contents
Zhou Yuan, Peng Manhua, An Xiaorui. Application of Gross Error in the Dock Cofferdam Construction Safety Monitoring[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2012, 26(5): 226-229,255. doi: 10.3969/j.issn.1007-2993.2012.05.003
Citation: Zhou Yuan, Peng Manhua, An Xiaorui. Application of Gross Error in the Dock Cofferdam Construction Safety Monitoring[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2012, 26(5): 226-229,255. doi: 10.3969/j.issn.1007-2993.2012.05.003

Application of Gross Error in the Dock Cofferdam Construction Safety Monitoring

doi: 10.3969/j.issn.1007-2993.2012.05.003
  • Received Date: 2012-06-05
    Available Online: 2021-07-06
  • The monitoring data of dock cofferdam is very important in the construction of dock. However, some incorrect factors led to the monitoring data does not match the actual situation. while the abnormal value can not be intuitive removed, thus it has a great impact on dock cofferdam construction safety monitoring, So it must be judged and handled. This article introduced 3σ, Grubbs and Dixon methods to handle the Gross Error, and applied them to the concrete dock cofferdam construction safety monitoring. The results showed that these methods which provide help to the dock cofferdam construction. They can quickly, easily and effectively handle the abnormal value in some degree.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (11) PDF downloads(4) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return