Volume 26 Issue 6
Jul.  2021
Turn off MathJax
Article Contents
Weng Qineng, Li Biao, Zeng Longquan. Fuzzy Comprehensive Evaluation of Highway Tunnel Collapse Risk[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2012, 26(6): 292-296. doi: 10.3969/j.issn.1007-2993.2012.06.005
Citation: Weng Qineng, Li Biao, Zeng Longquan. Fuzzy Comprehensive Evaluation of Highway Tunnel Collapse Risk[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2012, 26(6): 292-296. doi: 10.3969/j.issn.1007-2993.2012.06.005

Fuzzy Comprehensive Evaluation of Highway Tunnel Collapse Risk

doi: 10.3969/j.issn.1007-2993.2012.06.005
  • Received Date: 2012-09-25
    Available Online: 2021-07-06
  • The highway tunnel collapse in tunnel construction is the most common disaster accidents, so the tunnel for the risk assessment is particularly important, through the collection of highway tunnel landslide case history information; and comparing various factors relative to the important degree of highway tunnel collapse, find out the seven effects in the main risk factor for the class of surrounding rock, groundwater conditions, buried deep, large span, bias, blasting disturbance, construction management level, and then based on the fuzzy comprehensive evaluation method and frequency analysis method to determine the risk factor evaluation matrix and the corresponding weight, get the fuzzy comprehensive evaluation model, the model according to the specific situation of tunnel and the concept of fuzzy mathematics the tunnel risk assessment results, in the example verified, with the higher the objectivity and practicability.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (43) PDF downloads(4) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return