Zhu Qikun, Zhang Jinchao, Sheng Jianhao. Research on Geological Hazards and Prevention Engineering of a Power Plant Project Site[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2013, 27(6): 301-305. doi: 10.3969/j.issn.1007-2993.2013.06.008
Citation: Zhu Qikun, Zhang Jinchao, Sheng Jianhao. Research on Geological Hazards and Prevention Engineering of a Power Plant Project Site[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2013, 27(6): 301-305. doi: 10.3969/j.issn.1007-2993.2013.06.008

Research on Geological Hazards and Prevention Engineering of a Power Plant Project Site

doi: 10.3969/j.issn.1007-2993.2013.06.008
  • Received Date: 2013-06-24
  • The construction project site is close to the north open-pit of a mine,the minimum distance less than 10 m to the open-pit boundary. In addition,a thickness of 1.5~3.0 m weak interlayer is distributed continuously in the site foundation,and exposed on the open-pit slope. The weak interlayer and the open-pit slop constitutes a bedding slope. Because of the special surrounding environment and the structure of foundation,the project maybe suffer geological disasters risks,such as site integral slipping and landslide,and the harmful consequences is very serious. According to the calculation results of the site integral stability and the open-pit slope stability,the weak interlayer safety factor can meet the technical code,and the open-pit slope is in instability and must be reinforced. Considering the site stratigraphic structure and surrounding environmentect,a comprehensive prevention scheme is proposed,including cutting slope and reducing load,pretesting frame anchor,drainage system and engineering monitoring. In accordance with the mechanical properties of rock and soil mass in anchorage section,the anchorage force is determined. The internal forces of the lattice beams are calculated by the models of Winkler foundation elastic beam and continuous beam. After cutting slope and anchoring,the slope stability checking express that the safety factor can satisfy the technical code.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (49) PDF downloads(6) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return