Volume 31 Issue 1
Jul.  2021
Turn off MathJax
Article Contents
Qian Kaizhu, Lin Ye, Chang Tiesen. Drilling Technology and Exploration Evaluation in the Geothermal Well Construction in the Guozijian Region,Beijing[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2017, 31(1): 45-48. doi: 10.3969/j.issn.1007-2993.2017.01.011
Citation: Qian Kaizhu, Lin Ye, Chang Tiesen. Drilling Technology and Exploration Evaluation in the Geothermal Well Construction in the Guozijian Region,Beijing[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2017, 31(1): 45-48. doi: 10.3969/j.issn.1007-2993.2017.01.011

Drilling Technology and Exploration Evaluation in the Geothermal Well Construction in the Guozijian Region,Beijing

doi: 10.3969/j.issn.1007-2993.2017.01.011
  • Received Date: 2016-12-05
    Available Online: 2021-07-06
  • As a new type of renewable energy,geothermal resources can solve the contradiction between economic development and environmental protection in Beijing.After scientific and reasonable investigation,designation and construction,the JR-181 geothermal well has been successfully completed.In the processing of construction,successful treatments of drill pipe fracture,drill tool sticking,well blocking with collapse and the small amount of water yield,it ensured the drilling to be processed on schedule.The depth of well is 3700.88 m,the well yield per day is 519.18 m3,the temperature of water is 69.3 ℃.With these conditions,the JR-181 geothermal well has been evaluated as high-quality geothermal well.This project has end up the history that there is no geothermal well in the Guozijian region,Beijing.In addition,it plays an positive role to promote geothermal resources development in Beijing.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (30) PDF downloads(8) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return