The geological condition was poor in Qianhai area,Shenzhen,which was very unfavorable for the supporting project of foundation pit.In the background of a deep foundation pit of Qianhai area,the calculation of horizontal displacement were introduced in the paper,including difficulty analysis,unit calculation analysis and three-dimensional computation of exaction.The results were compared with the actual monitoring results,which was referenced as similar projects.