Volume 32 Issue 1
Jul.  2021
Turn off MathJax
Article Contents
Guo Hongmei. Geological Risk and Technical Measures Research on Cretaceous Mudstone Strata during Subway Construction of Changchun District[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2018, 32(1): 21-27. doi: 10.3969/j.issn.1007-2993.2018.01.005
Citation: Guo Hongmei. Geological Risk and Technical Measures Research on Cretaceous Mudstone Strata during Subway Construction of Changchun District[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2018, 32(1): 21-27. doi: 10.3969/j.issn.1007-2993.2018.01.005

Geological Risk and Technical Measures Research on Cretaceous Mudstone Strata during Subway Construction of Changchun District

doi: 10.3969/j.issn.1007-2993.2018.01.005
  • Received Date: 2017-09-01
    Available Online: 2021-07-06
  • The article makes a systematic research on basic geological features of Cretaceous mudstone by analysis of mineral composition,micro electric microscopy,physical and mechanical property test,expansion and slaking test of different weathering degree mudstone,wave velocity,resistivity test,anlysizing geological risk probably existing in subway construction in Cretaceous mudstone,putting forward corresponding technical measures and suggestions,providing a geological reference for subway design and construction.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (45) PDF downloads(9) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return