Volume 33 Issue 5
Jul.  2021
Turn off MathJax
Article Contents
Jiang Bo. Measures and Engineering Project Cases of the Tunnel Karst Treatment in the Fuxiu Second Line of the Yuhuai Railway[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2019, 33(5): 299-302. doi: 10.3969/j.issn.1007-2993.2019.05.011
Citation: Jiang Bo. Measures and Engineering Project Cases of the Tunnel Karst Treatment in the Fuxiu Second Line of the Yuhuai Railway[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2019, 33(5): 299-302. doi: 10.3969/j.issn.1007-2993.2019.05.011

Measures and Engineering Project Cases of the Tunnel Karst Treatment in the Fuxiu Second Line of the Yuhuai Railway

doi: 10.3969/j.issn.1007-2993.2019.05.011
  • Received Date: 2019-06-28
    Available Online: 2021-07-06
  • A large number of karst caves were discovered during the tunnel construction in the Fuxiu second line of the Yuhuai Railway,with high safety risks during the construction.The karst tunnels are classified,and different control measures are taken according to different project conditions,including concrete backfill,steel tube grouting,high pressure jet grouting pile or pile foundation joist(or beam bridge)structure crossing.Well effect of construction is verified according to the site engineering project cases.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (55) PDF downloads(10) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return