Volume 35 Issue 1
Jul.  2021
Turn off MathJax
Article Contents
Wu Zucheng, Guo Shanfeng, He Weimin. Application of High and Steep Rock Slope in Mine[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2021, 35(1): 48-51. doi: 10.3969/j.issn.1007-2993.2021.01.010
Citation: Wu Zucheng, Guo Shanfeng, He Weimin. Application of High and Steep Rock Slope in Mine[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2021, 35(1): 48-51. doi: 10.3969/j.issn.1007-2993.2021.01.010

Application of High and Steep Rock Slope in Mine

doi: 10.3969/j.issn.1007-2993.2021.01.010
  • Received Date: 2019-11-14
    Available Online: 2021-07-06
  • Publish Date: 2021-07-06
  • Coal mine geological environment restoration project in Luanchuan County is introduced as an example. Measures such as bolt mesh shotcreting, soil placement with bored bamboo tube and drip irrigation technology are adopted for comprehensive treatment, which can reduce the traditional large excavation method of high and steep rock slope to eliminate the geological hazards of the slope, and facilitate the subsequent step greening. This technology will reduce great damage to the mountain in the treatment area, and reduce the disposal earthwork of engineering construction. On the other hand, the use of drilling bamboo tube soil and drip irrigation technology could also improve the greening effect and engineering maintenance. The engineering treatment technology has reference value in the geological environment treatment of similar mines in Henan Province.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (156) PDF downloads(51) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return