Volume 35 Issue 4
Aug.  2021
Turn off MathJax
Article Contents
Zhu Jian, Li Xingsheng, Wang Jian. Civil Design Scheme of Subsea Tunnel Under Complex Conditions[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2021, 35(4): 222-227. doi: 10.3969/j.issn.1007-2993.2021.04.003
Citation: Zhu Jian, Li Xingsheng, Wang Jian. Civil Design Scheme of Subsea Tunnel Under Complex Conditions[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2021, 35(4): 222-227. doi: 10.3969/j.issn.1007-2993.2021.04.003

Civil Design Scheme of Subsea Tunnel Under Complex Conditions

doi: 10.3969/j.issn.1007-2993.2021.04.003
  • Received Date: 2020-06-08
  • Publish Date: 2021-08-25
  • The engineering geological conditions of Dalian subsea tunnel are complex. It is close to gas station, large ship manufacturing base and other buildings. Meanwhile, it is difficult and risky to pass through the existing subway, freight railway, military port and a large number of buildings. According to the characteristics and difficulties of subsea tunnel, the route scheme, construction method comparison, cross-section scheme, horizontal and vertical section scheme and shield segment design are studied. The main research conclusions are as follows: (1) Under the specific environmental conditions of the project, the construction method of cross sea tunnel adopts the scheme of single tunnel double track large shield with less environmental impact and low construction risk; (2) the deepest soil cover of the tunnel is the control condition of segment stress, and the maximum internal force is located at the vault; (3) considering the mechanical equipment and site conditions, 2 m segment ring width makes the number of circumferential joints in the tunnel the least, which is beneficial to improve the longitudinal stiffness of the tunnel, speed up the construction progress and reduce the cost; (4) the universal segment ring scheme with high assembly automation degree is adopted, which saves the number of steel formwork and is easy to rectify deviation; (5) the cross sea tunnel passes through the stratum with uneven hardness and soft, and the structural stress is relatively high. Considering the seismic requirements, the segment ring and longitudinal connection joints are all connected by inclined bolts.

     

  • loading
  • [1]
    王梦恕. 水下交通隧道发展现状与技术难题[J]. 岩石力学与工程学报,2008,279(11):2161-2172. doi: 10.3321/j.issn:1000-6915.2008.11.001
    [2]
    肖明清. 广深港客运专线狮子洋水下隧道设计 中的几个关键技术问题[C]. 中国高速铁路隧道国际技术交流会论文集, 2006.
    [3]
    殷瑞华,梁 巍. 厦门东通道跨海工程比选[J]. 岩石力学与工程学报,2004,23(S2):4778-4786.
    [4]
    孙 钧. 海底隧道工程设计施工若干关键技术的商榷[J]. 岩石力学与工程学报,2006,25(8):1513-1521. doi: 10.3321/j.issn:1000-6915.2006.08.001
    [5]
    孙 钧. 论跨江越海建设隧道的技术优势与问题[J]. 隧道建设,2013,33(5):337-342.
    [6]
    赵 月. 厦门轨道交通3号线超长跨海地铁隧道土建设计方案比选[J]. 隧道建设,2015,35(6):547-553. doi: 10.3973/j.issn.1672-741X.2015.06.009
    [7]
    徐安宁. 深圳妈湾跨海通道总体方案设计关键技术研究[J]. 城市道桥与防洪,2018,(10):5-8.
    [8]
    周华贵,王 丽. 汕头市苏埃通道工程海域段平纵横方案研究[J]. 隧道建设,2018,38(7):1189-1195. doi: 10.3973/j.issn.2096-4498.2018.07.015
    [9]
    乐贵平,吕卫东. 地铁盾构法隧道管片设计的几个问题[J]. 市政技术,2003,21(5):325-329. doi: 10.3969/j.issn.1009-7767.2003.05.018
    [10]
    张金龙,苟长飞,叶 飞. 大断面跨海盾构隧道结构设计与参数分析[J]. 现代隧道技术,2020,57(2):61-67.
    [11]
    肖明清,邓朝辉,何 川. 武汉长江隧道管片结构关键技术研究[J]. 铁道工程学报,2011,(10):84-89. doi: 10.3969/j.issn.1006-2106.2011.10.016
    [12]
    王翔昊,杨 峥,安 然. 某地铁跨海隧道工程选线研究[J]. 铁道工程学报,2015,(12):1-6. doi: 10.3969/j.issn.1006-2106.2015.12.001
    [13]
    建标 104—2008 城市轨道交通工程项目建设标准[S]. 北京: 中国计划出版社, 2008.
    [14]
    GB 51298—2018 地铁设计防火标准 [S]. 北京: 中国建筑工业出版社, 2013.
    [15]
    GB 50157—2013 地铁设计规范[S]. 北京: 中国建筑工业出版社, 2018.
    [16]
    姜 燕,杨光华,陈富强,等. 湛江湾高水头跨海盾构隧道管片结构典型断面受力计算与监测反馈分析[J]. 岩土力学,2018,39(1):275-285.
    [17]
    由广明,刘 念. 超大直径盾构隧道标准化设计研究[J]. 城市道桥与防洪,2020,(8):308-313.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(7)  / Tables(3)

    Article Metrics

    Article views (82) PDF downloads(20) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return