Analysis of Ground Settlement Caused by Shield Passing Through the Area of Long-term Precipitation

doi: 10.3969/j.issn.1007-2993.2022.03.012
  • Received Date: 2021-04-15
    Available Online: 2022-06-02
  • Publish Date: 2022-06-08
  • The main stratum of Chengdu rail transit construction is sandy pebble stratum, which is mixed with a large number of fine particles. Some EPB tunnels need to cross the existing cut and cover stations with long-term precipitation. The vertical displacement of soil mass during construction is significantly different from that in the area without precipitation. Soil structure, settlement mechanism, settlement control mode and engineering examples in long-term precipitation area were analyzed, and conclusions are as following: (1) long-term precipitation of foundation pit will lead to the loss of fine particles in the sandy pebble stratum, forming a skeleton pore structure; (2) the properties of grouting and improved grouting materials have a significant control effect on the vertical displacement of soil caused by area of fine particle loss due to long-term precipitation; (3) the largest proportion of settlement is caused by the shield tail out stage when the precipitation area is not entered, the proportion of soil consolidation settlement and cutter arrival stage increases after entering the precipitation area. The conclusions have been verified by the shield engineering of Ming-Jiu section of Chengdu rail transit Line 17, and the research results can provide theoretical basis and reference value for similar projects.

     

  • loading
  • [1]
    郑 刚,邓 旭,刘庆晨. 承压含水层减压降水对既有盾构隧道影响研究[J]. 岩土力学,2015,36(1):178-188.
    [2]
    胡绮琳. 地下水对地铁工程影响及防治对策研究[D]. 广州: 华南理工大学, 2009.
    [3]
    黄震江,林尚连. 盾构始发段管井降水土体加固技术[J]. 施工技术,2009,38(S2):273-275.
    [4]
    唐卓华,杨新安,徐前卫,等. 富水砂层盾构脱困降水方案设计与效果分析[J]. 现代隧道技术,2016,53(4):172-178.
    [5]
    江 华,张晋勋,江玉生. 北京地铁砂卵石地层盾构推力组成及可控因素敏感性研究[J]. 现代隧道技术,2013,50(4):109-114. doi: 10.3969/j.issn.1009-6582.2013.04.017
    [6]
    江 华. 北京典型砂卵石地层土压平衡盾构适应性研究[D]. 北京: 中国矿业大学(北京), 2012.
    [7]
    曲军彪. 高压富水地层深基坑开挖降水及其对周围地表和建筑物沉降影响的研究[D]. 北京: 北京交通大学, 2007.
    [8]
    李 潮. 砂卵石地层土压平衡盾构关键参数计算模型研究[D]. 北京: 中国矿业大学(北京), 2013.
    [9]
    胡 浩. 基坑降水对盾构隧道影响数值分析研究[J]. 中国水运(下半月),2014,14(6):329-332.
    [10]
    胡冰冰,路林海,李 罡,等. 富水砂卵石基坑封闭降水与回灌工程关键技术[J]. 都市快轨交通,2021,(3):92-97.
    [11]
    张 明,梁天义. 基坑降水对下卧地铁盾构隧道的影响[J]. 信阳师范学院学报(自然科学版),2019,32(3):505-510.
    [12]
    夏晨欢,郑 杰,吴初兴. 井点降水在上海地区地铁盾构进、出洞施工中的应用[J]. 地下工程与隧道,2012,(2):38-41.
    [13]
    刘庆晨. 邻近施工对天津既有地铁隧道的影响及保护研究[D]. 天津: 天津大学, 2013.
    [14]
    胡 敏. 砂卵石土物理力学特性及盾构施工响应的数值模拟研究[D]. 广州: 华南理工大学, 2014.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(11)

    Article Metrics

    Article views (85) PDF downloads(32) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return