Volume 37 Issue 4
Aug.  2023
Turn off MathJax
Article Contents
Liu Dingqing, Xie Wo, Jia Yanling. Highway Tunnel Vertical Filling Type Cave Roof Caving and the Treatment of Catastrophic Impact Factor Analysis[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2023, 37(4): 422-427. doi: 10.3969/j.issn.1007-2993.2023.04.008
Citation: Liu Dingqing, Xie Wo, Jia Yanling. Highway Tunnel Vertical Filling Type Cave Roof Caving and the Treatment of Catastrophic Impact Factor Analysis[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2023, 37(4): 422-427. doi: 10.3969/j.issn.1007-2993.2023.04.008

Highway Tunnel Vertical Filling Type Cave Roof Caving and the Treatment of Catastrophic Impact Factor Analysis

doi: 10.3969/j.issn.1007-2993.2023.04.008
  • Received Date: 2022-06-23
  • Accepted Date: 2023-03-02
  • Rev Recd Date: 2022-09-07
  • Publish Date: 2023-08-08
  • Based on a highway tunnel in the area in guangxi karst cave roof collapse case, according to the treatment design of karst disaster, the finite element software was used to simulate the treatment effect, and the deformation law of the vertical developed filling cave with tunnel crossing was obtained. On this basis, in order to prove the effectiveness and rationality of the disaster treatment scheme design, the three major disaster control factors of pipe shed support, initial support thickness and geological characteristics were studied by using the control variable method, and the influence of each factor on the stability of the tunnel structure was analyzed. The engineering treatment effect, model calculation result and monitoring measurement result prove that the design of disaster treatment scheme is reasonable, safe and reliable. The relevant research results have certain reference significance for the design and construction of similar karst tunnel engineering.

     

  • loading
  • [1]
    史世雍,梅世龙,杨志刚. 隧道顶部溶洞对围岩稳定性的影响分析[J]. 地下空间与工程学报,2005,(5):698-702, 716.
    [2]
    王 勇,孙彩红. 隧道底部溶洞顶板安全厚度预测模型[J]. 公路,2006,(5):228-233. doi: 10.3969/j.issn.0451-0712.2006.05.054
    [3]
    赖金星,汪 珂,邱军领. 溶洞位置对隧道结构影响的数值模拟研究[J]. 公路,2015,60(8):275-281.
    [4]
    张成平,张顶立,叶 英,等. 高压富水岩溶隧道注浆机理及作用效果分析[J]. 地下空间与工程学报,2009,5(5):996-1002. doi: 10.3969/j.issn.1673-0836.2009.05.029
    [5]
    苗德海. 宜万铁路野三关隧道响水坪地下暗河发育特征及方案研究[J]. 铁道标准设计,2012,(8):75-79. doi: 10.3969/j.issn.1004-2954.2012.08.020
    [6]
    孙国庆,张民庆. 圆梁山隧道粉细砂充填型溶洞注浆技术探讨[J]. 现代隧道技术,2005,(5):74-78. doi: 10.3969/j.issn.1009-6582.2005.05.013
    [7]
    赵玉龙. 宜万铁路云雾山隧道“+260”高压富水充填溶洞综合治理技术[J]. 铁道标准设计,2010,(8):111-115. doi: 10.3969/j.issn.1004-2954.2010.08.028
    [8]
    马 涛. 隧道工程饱水充填型溶洞处理技术研究[J]. 铁道工程学报,2010,27(6):74-78. doi: 10.3969/j.issn.1006-2106.2010.06.017
    [9]
    曹校勇,张 龙,林永锋. 羊桥坝隧道大型干溶洞处理方案研究[J]. 现代隧道技术,2014,51(4):185-190. doi: 10.13807/j.cnki.mtt.2014.04.027
    [10]
    刘同江. 高山隧道巨型溶洞回填处置技术研究[J]. 公路,2020,65(10):348-355.
    [11]
    王 建,王丽君,马建新,等. 贵州凯里环城高速新街隧道岩溶调查及应对措施[J]. 岩土工程技术,2020,34(5):276-281, 285.
    [12]
    张美聪. 红黏土岩溶地区地铁盾构隧道处理措施研究[J]. 岩土工程技术,2020,34(4):201-205.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(12)  / Tables(5)

    Article Metrics

    Article views (73) PDF downloads(14) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return