Volume 38 Issue 1
Feb.  2024
Turn off MathJax
Article Contents
Zhang Chao, Wu Hua, Jiang Tonghu. Cause Analysis and Treatment Measures for the Collapse at the Entrance of Diaoyutai Tunnel[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2024, 38(1): 58-64. doi: 10.3969/j.issn.1007-2993.2024.01.010
Citation: Zhang Chao, Wu Hua, Jiang Tonghu. Cause Analysis and Treatment Measures for the Collapse at the Entrance of Diaoyutai Tunnel[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2024, 38(1): 58-64. doi: 10.3969/j.issn.1007-2993.2024.01.010

Cause Analysis and Treatment Measures for the Collapse at the Entrance of Diaoyutai Tunnel

doi: 10.3969/j.issn.1007-2993.2024.01.010
  • Received Date: 2022-04-25
  • Accepted Date: 2022-12-09
  • Rev Recd Date: 2022-06-12
  • Publish Date: 2024-02-05
  • An in-depth analysis was conducted on the causes of the collapse at the entrance of the Diaoyutai Tunnel on the Chi-Qi Expressway, and corresponding measures for dealing with the collapse were proposed. The effectiveness of the collapse treatment was verified through on-site monitoring and analysis. The research results indicate that the collapse of the Diaoyutai Tunnel entrance is the result of a combination of various factors such as terrain, geology, rainfall, and improper construction measures. Among them, terrain and geological conditions are the internal factors that cause the collapse, while rainfall and improper construction measures are the external factors that induce the collapse. Based on the above influencing factors and combined with the actual situation of the tunnel entrance, a comprehensive treatment plan of temporary support+permanent protection has been proposed, which includes reinforcement of the tunnel arch, backfilling of the tunnel face with back pressure, unloading of the collapsed body, double layer small conduit support at the entrance, extension of the open cut tunnel, and protection of the roof and forward slope anchor rod frame. The on-site inspection and monitoring data indicate that the treatment measures for tunnel entrance collapse are appropriate, and the engineering effect is significant, achieving the expected purpose.

     

  • loading
  • [1]
    郑玉欣. 隧道施工塌方机理分析及处治技术[J]. 铁道工程学报,1999,6(2):69-72.
    [2]
    王立忠,胡亚元,王柏林,等. 崩塌松散围岩隧道施工稳定分析与监控[J]. 岩石力学与工程学报,2003,22(4):589-594. doi: 10.3321/j.issn:1000-6915.2003.04.016
    [3]
    霍玉华. 浅埋公路隧道施工塌方事故的预防与整治技术研究[J]. 中国安全科学学报,2005,15(7):84-87. doi: 10.3969/j.issn.1003-3033.2005.07.020
    [4]
    马 涛. 浅埋隧道塌方处治方法研究[J]. 岩石力学与工程学报,2006,25(S2):3976-3981.
    [5]
    陈秋南,张永兴,刘新荣,等. 隧道塌方区加固后的施工监测与仿真分析[J]. 岩石力学与工程学报,2006,25(1):158-161. doi: 10.3321/j.issn:1000-6915.2006.01.026
    [6]
    陈秋南,赵明华,周国华,等. 复杂层状岩层隧道塌方原因分析与加固后信息化施工技术[J]. 岩土力学,2009,30(3):650-653. doi: 10.3969/j.issn.1000-7598.2009.03.013
    [7]
    汪成兵,朱合华. 隧道塌方机制及其影响因素离散元模拟[J]. 岩土工程学报,2008,30(3):450-456. doi: 10.3321/j.issn:1000-4548.2008.03.025
    [8]
    李志厚,杨晓华,来弘鹏,等. 公路隧道特大塌方成因分析及综合处治方法研究[J]. 工程地质学报,2008,16(6):806-812. doi: 10.3969/j.issn.1004-9665.2008.06.012
    [9]
    卢义玉,陈凌云,冯卫强,等. 锚喷支护及小导管注浆再隧道塌方段中的应用[J]. 重庆大学学报,2009,32(5):572-576. doi: 10.11835/j.issn.1000-582X.2009.05.017
    [10]
    王华牢,李 宁,王 皓. 隧道施工塌方风险评估与控制措施[J]. 交通运输工程学报,2010,10(4):34-38. doi: 10.3969/j.issn.1671-1637.2010.04.006
    [11]
    王迎超,尚岳全,靖洪文,等. 隧道塌方施工方案优化及效果评价[J]. 岩土力学,2011,32(2):514-520.
    [12]
    左清军,吴 立,林存友,等. 富水软岩隧道跨越断层段塌方机制分析及处治措施[J]. 岩石力学与工程学报,2016,35(2):369-377. doi: 10.13722/j.cnki.jrme.2014.1632
    [13]
    高 登. 上坪格隧道塌方原因分析及处治措施研究[J]. 现代隧道技术,2017,54(1):191-197. doi: 10.13807/j.cnki.mtt.2017.01.028
    [14]
    侯艳娟,张顶立,李 奥. 隧道施工塌方事故分析与控制[J]. 现代隧道技术,2018,55(1):45-52. doi: 10.13807/j.cnki.mtt.2018.01.006
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(14)  / Tables(1)

    Article Metrics

    Article views (93) PDF downloads(16) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return