Lin Xiang, Chen Xiangyu, Wei Jincheng. Influence of Shield Close-spaced Construction on Settlement of Bridge Pile and Protective Measures[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2024, 38(4): 391-397. doi: 10.3969/j.issn.1007-2993.2024.04.003
Citation: Lin Xiang, Chen Xiangyu, Wei Jincheng. Influence of Shield Close-spaced Construction on Settlement of Bridge Pile and Protective Measures[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2024, 38(4): 391-397. doi: 10.3969/j.issn.1007-2993.2024.04.003

Influence of Shield Close-spaced Construction on Settlement of Bridge Pile and Protective Measures

doi: 10.3969/j.issn.1007-2993.2024.04.003
  • Received Date: 2023-03-13
  • Accepted Date: 2023-11-08
  • Rev Recd Date: 2023-05-17
  • Available Online: 2024-08-09
  • Publish Date: 2024-08-09
  • During close-spaced tunnel construction passing through existing bridge piles, and based on the field measured data, the change rules of bridge pile settlement, the settlement proportion of each stage, the distribution of soft strata in the tunnel body, and the impact of sleeve valve pipe driving method on the bridge pile settlement were analyzed. The conclusion shows that when shield tunneling side through bridge piles in soft strata, the vertical displacement of the bridge pile shows the change rule of “first rising slightly, then sinking”; the settlement of bridge piles mainly occurs during and one week after the shield passes, accounting for 80%~90% of the total settlement; when the plane clear distance between the tunnel and the bridge pile is less than 2D, the bridge pile adjacent to the tunnel shall be pre-grouted with sleeve valve pipe around the pile for reinforcement, which can effectively reduce the impact of shield construction on the settlement of the bridge pile; the higher the distribution proportion of soft soil layer in the tunnel body, the greater the settlement of bridge piles; the sleeve valve pipe grouting hole around the pile shall be set vertically to avoid the blind area of grouting, so as to ensure the effect of soil reinforcement and bridge pile settlement control.

     

  • loading
  • [1]
    游 辉. 盾构隧道下穿城市立交桥影响性分析[J]. 铁道建筑技术,2019,309(4):71-74,79.
    [2]
    赵玉勃, 张忠苗. 盾构法隧道推进引起周围土体的附加应力分析[J]. 岩土工程学报,2010,32(9):1386-1391.
    [3]
    魏 纲, 王 霄, 张鑫海. 多因素下双线盾构隧道施工引起的土体变形研究[J]. 现代隧道技术, 2018, 55(3): 130 -138.
    [4]
    徐长节, 陈其志, 任凌云. 软土地区地铁盾构穿越对城市立交桥的影响分析[J]. 地下空间与工程学报, 2016, 12(3): 769-775.
    [5]
    祝 勇. 盾构近距离侧穿桥桩数值模拟与施工控制技术研究[J]. 铁道建筑技术,2018,295(4):33-36,52. doi: 10.3969/j.issn.1009-4539.2018.04.008
    [6]
    郑熹光, 何 平, 张安琪, 等. 地铁施工对邻近桥梁桩基础内力影响分析[J]. 现代隧道技术,2015,52(3):110-117.
    [7]
    仇文革, 雷 劲. 上软下硬地层地铁隧道与近接桥梁桩基的相互影响分区研究[J]. 隧道建设,2017,37(8):917-925.
    [8]
    王 闯, 彭祖昭, 苟 超, 等. 盾构近接下穿群桩基础施工影响分区研究[J]. 土木工程学报,2017,50(S2):174-181.
    [9]
    周 鑫, 杨建辉, 刘 涛. 盾构法施工对近距离侧穿桥梁桩基的影响分析[J]. 地下空间与工程学报,2022,18(2):586-595. doi: 10.3969/j.issn.1673-0836.2022.2.dxkj202202027
    [10]
    GB 50911—2013 城市轨道交通工程监测技术规范[S].
    [11]
    CJJ 99 —2017 城市桥梁养护技术标准 [S].
    [12]
    苏 斌, 苏 艺. 地铁穿越桥梁结构影响与关键控制技术[M]. 北京: 北京交通大学出版社, 2015.
    [13]
    王旭东, 刘朝明, 刘纯洁, 等. 淤泥质黏土层盾构推进的地层扰动分析[J]. 地下空间与工程学报,2016,12(2):471-476.
    [14]
    周灿朗. 粉细砂地层盾构施工地层变形规律分析[J]. 铁道建筑,2016(3):79-82. doi: 10.3969/j.issn.1003-1995.2016.03.19
    [15]
    毛志轶, 李发勇, 杨琼鹏. 富水饱和粉细砂地层盾构穿越建筑物沉降控制技术[J]. 隧道建设,2012,32(S2):72-78.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(14)

    Article Metrics

    Article views (62) PDF downloads(17) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return