Volume 38 Issue 4
Aug.  2024
Turn off MathJax
Article Contents
Wang Yuan, Li Weiqiang, Tang Hu. The Phased Construction Settlement Analysis of Beijing Fengtai Station Reconsruction and Expansion Project[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2024, 38(4): 420-426. doi: 10.3969/j.issn.1007-2993.2024.04.008
Citation: Wang Yuan, Li Weiqiang, Tang Hu. The Phased Construction Settlement Analysis of Beijing Fengtai Station Reconsruction and Expansion Project[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2024, 38(4): 420-426. doi: 10.3969/j.issn.1007-2993.2024.04.008

The Phased Construction Settlement Analysis of Beijing Fengtai Station Reconsruction and Expansion Project

doi: 10.3969/j.issn.1007-2993.2024.04.008
  • Received Date: 2023-03-07
  • Accepted Date: 2023-11-08
  • Rev Recd Date: 2023-06-17
  • Available Online: 2024-08-09
  • Publish Date: 2024-08-09
  • During the construction period, it is necessary to ensure that the existing railway transportation line that originally passed through here was not affected. The project of Fengtai station reconstruction was divided into three phases of construction, and construction was carried out in two phases in sequence and post-cast strips were set up at the junction of the phased construction. Due to the station's main structure consisting mainly of cast-in-place concrete frame structures, the presence of post-cast strips has a significant impact on the progress of subsequent construction. Based on the deformation calculation analysis of the superstructure-foundation-soil, a refined modeling of the strata, structure, and construction steps was carried out. The results show that the differential settlement caused by the later construction on both sides of the settlement post pouring belt meets the specifications and design requirements. The settlement post-cast strips were cancelled and created conditions to ensure the construction period. Verified by settlement measurement data, the numerical calculation prediction results are reliable, and this method can be used as a reference for similar projects.

     

  • loading
  • [1]
    王曙光, 邸道怀, 周圣斌. 中低压缩性地基上设置沉降后浇带的主裙楼沉降及基底反力分布特征[J]. 岩土力学,2014,35(2):313-318.
    [2]
    杨嗣信, 李国胜. 后浇带设置相关问题分析[J]. 建筑技术,2018,49(5):452-456.
    [3]
    朱 翔, 于海宾, 郭院成, 等. 桩筏基础沉降后浇带浇筑时机研究[J]. 建筑结构,2017,47(9):85-89.
    [4]
    王曙光. 整体大面积筏形基础试验与设计研究[J]. 施工技术,2018,47(6):128-132,141.
    [5]
    王 媛, 孙宏伟. 北京Z15地块超高层建筑桩筏基础的数值分析[J]. 建筑结构,2013,43(17):134-139.
    [6]
    王 媛, 孙宏伟, 束伟农, 等. 北京新机场航站楼桩筏基础基于差异变形控制的设计与分析[J]. 建筑结构,2016,46(17):93-98.
    [7]
    王 媛, 魏 勇, 方云飞, 等. 基于差异沉降控制的多结构单元观演建筑大底盘基础的地基设计实例分析[C]// 第七届深基础工程发展论坛论文集. 厦门: 九州出版社, 2017.
    [8]
    王 媛, 李伟强, 孙宏伟. 厚层黏性土地基上某超高层古建筑桩筏基础三维数值分析[J]. 建筑结构,2014(20):120-122.
    [9]
    王 媛, 孙宏伟. 北京第三系岩层工程地质特性与高层建筑基桩承载性状试验分析[J]. 岩土工程技术,2018,32(1):10-16.
    [10]
    王 媛. 北京丽泽商务区高层建筑地基基础选型分析[C]// 第八届深基础工程发展论坛. 南昌: 九州出版社, 2018.
    [11]
    GB 50007—2011 建筑地基基础设计规范 [S].
    [12]
    JGJ 8—2016 建筑变形测量规范[S].
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(15)  / Tables(1)

    Article Metrics

    Article views (56) PDF downloads(18) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return