Zhang Liangbing, Pan Qihui, Han Yinshan. Analysis and Treatment of Subgrade Settlement in a Certain Section of the Yechi Railway[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2024, 38(6): 712-717. doi: 10.3969/j.issn.1007-2993.2024.06.011
Citation: Zhang Liangbing, Pan Qihui, Han Yinshan. Analysis and Treatment of Subgrade Settlement in a Certain Section of the Yechi Railway[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2024, 38(6): 712-717. doi: 10.3969/j.issn.1007-2993.2024.06.011

Analysis and Treatment of Subgrade Settlement in a Certain Section of the Yechi Railway

doi: 10.3969/j.issn.1007-2993.2024.06.011
  • Received Date: 2023-11-22
  • Accepted Date: 2024-03-11
  • Rev Recd Date: 2024-01-01
  • Publish Date: 2024-12-06
  • A certain section of the Yechi Railway was affected by subgrade settlement disease. Through on-site geological investigation and analysis, it was found that the mining of coal seams changed the stress balance state of the surrounding strata, causing plastic deformation of the fault fracture zone along the F1 fault downwards, in addition, the Quaternary strata experienced drift sand along the fault, ultimately leading to subsidence and deformation of the ground. Based on the engineering situation, the treatment scheme of grouting in the Quaternary strata and grouting in fault zones was adopted to improve the mechanical properties of the Quaternary strata in the railway roadbed and enhance the plastic deformation resistance of the fractured zone. The characteristics of directional quantitative sizing and repeatability of sleeve valve pipe grouting were reflected by this plan. This scheme can provide a reference for similar projects.

     

  • loading
  • [1]
    周秋华. 石太铁路客运专线路基工后沉降的施工控制与监测[J]. 铁道标准设计,2007(4):113-117.
    [2]
    赵国堂, 赵如锋, 刘俊飞. 高速铁路路基工后沉降变形源、变形传递与轨道不平顺控制方法[J]. 铁道学报,2020,42(12):127-134.
    [3]
    廖 超, 周青爽, 刘 勇. 深埋软弱下卧层路堤病害分析与整治[J]. 铁道建筑技术,2023(10):218-221.
    [4]
    林存龙. 既有线路路基常见病害分类及处理措施[J]. 四川水泥,2019(8):351.
    [5]
    程 康. 兰新高速铁路某区段路基沉降整治措施及治理效果研究[D]. 兰州: 兰州交通大学, 2018.
    [6]
    毛 波. 试析常见铁路路基病害及路基加固技术[J]. 智能城市,2018,4(8):147-148.
    [7]
    霍伟珺. 常见铁路路基病害及路基加固技术分析[J]. 科技创新与应用,2018(4):46-48.
    [8]
    殷李进. 既有铁路路基下沉加固施工技术[J]. 江苏建材,2022(2):58-60.
    [9]
    沈仕杰. 既有铁路路基下沉加固施工技术研究[J]. 价值工程,2023,42(5):103-105.
    [10]
    朱俊勋, 邢介东, 孟陆波, 等. 胶济客专路基下沉原因分析与整治[J]. 铁道建筑,2014(5):100-103.
    [11]
    李景安. 注浆处理铁路高路基下沉和溜坍施工技术[J]. 铁道建筑,2008(2):83-85.
    [12]
    张 鑫, 高旭和. 道路下伏煤矿采空区危害与注浆效果分析[J]. 煤炭技术,2017,36(9):153-155.
    [13]
    王兵强. 深部条带采空区注浆效果综合评价技术与应用[J]. 煤炭工程,2021,53(8):98-104.
    [14]
    宁 浩. 高速铁路采空区地基“活化”分级评价方法及工程应用[D]. 焦作: 河南理工大学, 2021.
    [15]
    李 伟. 高速铁路下软岩采空区稳定性及变形控制研究[D]. 青岛: 青岛理工大学, 2018.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(9)

    Article Metrics

    Article views (70) PDF downloads(19) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return