Volume 16 Issue 6
Jul.  2021
Turn off MathJax
Article Contents
the Method for Confirming the Natural Permafrost Table in Gela Section of Qingzang Railway[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2002, 16(6): 315-318.
Citation: the Method for Confirming the Natural Permafrost Table in Gela Section of Qingzang Railway[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2002, 16(6): 315-318.

the Method for Confirming the Natural Permafrost Table in Gela Section of Qingzang Railway

  • Received Date: 2002-10-10
    Available Online: 2021-07-20
  • It is seasonal thawing layer nearby natural permafrost table offecting the building stability in permafrost area.It is important work to confirm the position of natural permafrost table and grasp its change law.Introducing the exploring method of natural permafrost table in Qingzang railway.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (46) PDF downloads(3) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return