Tlie successful experience of the ejecting reverse-circulation drilling and percussion and grabbing drilling is introdaced based on the case of the constrcction of the bridge drilled cast-in-place pile with large diameter in the Huiming area of the highway from Jinan to Qingdao in this paper.