Discussion on Constructional Parameter and Technological Process of Twist Drill-Concrete Pump Piling of CFG Piles[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2001, 15(2): 107-111.
	
		
			| Citation:
			
			 | 
													Discussion on Constructional Parameter and Technological Process of Twist Drill-Concrete Pump Piling of CFG Piles[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2001, 15(2): 107-111. 								
				
			 | 
		
	
 
	
		Discussion on Constructional Parameter and Technological Process of Twist Drill-Concrete Pump Piling of CFG Piles[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2001, 15(2): 107-111.
	
		
			| Citation:
			
			 | 
													Discussion on Constructional Parameter and Technological Process of Twist Drill-Concrete Pump Piling of CFG Piles[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2001, 15(2): 107-111. 								
				 | 
		
	
  
			
				
					
						
Discussion on Constructional Parameter and Technological Process of Twist Drill-Concrete Pump Piling of CFG Piles
					
					
						
					
					
					
                        
		    		
						
							
							
							- Received Date: 2000-12-25
									
								Available Online:
					                    2021-07-29