the Formation Mechansism and Treatment Measure of the Motive Sand-flood of Cuona Lake on Qingzang Railway[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2002, 16(6): 311-314,360.
Citation:
the Formation Mechansism and Treatment Measure of the Motive Sand-flood of Cuona Lake on Qingzang Railway[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2002, 16(6): 311-314,360.
the Formation Mechansism and Treatment Measure of the Motive Sand-flood of Cuona Lake on Qingzang Railway[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2002, 16(6): 311-314,360.
Citation:
the Formation Mechansism and Treatment Measure of the Motive Sand-flood of Cuona Lake on Qingzang Railway[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2002, 16(6): 311-314,360.
Through analyzing the distribution and formation mechanism of the motive sand-flood of Cuona lake on Qingzang railway,putting forward a rational line-determnation principle and a series of engineering treatment measure,in order to decrease the damage of wind and sand to the railway at least.