Lin Xingchao, Wang Yujie, Xu Nengxiong. Numerical Simulation of “Wedge” at Left Abutment of Jinping First Stage Hydropower Station[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2009, 23(2): 55-59.
Citation: Lin Xingchao, Wang Yujie, Xu Nengxiong. Numerical Simulation of “Wedge” at Left Abutment of Jinping First Stage Hydropower Station[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2009, 23(2): 55-59.

Numerical Simulation of “Wedge” at Left Abutment of Jinping First Stage Hydropower Station

  • Received Date: 2008-12-12
  • There is a complex geological condition in the left bank of Jinping First Stage Hydropower Station. The wedge's stabilizing is one of the most important problems in the project which is composed of several weak layers. Support methods such as pro-stressed anchors system and shear key were adopted to ensure wedge safety. In order to research the two support methods and construction processes' influence in slope stability, the slope continue excavating with the two support methods in deferent construction processes have been used for numerical simulation. After comparison of plastic zone and variation of displacement, it is find that pro-stressed anchors system have an effect on limiting the development of plastic zone, refilling shear keys have en effect on control the displacement of the fault f42-9 which is the bottom slip surface of the wedge. It is very important for the left bank slope stability that completed the two support methods in time. It is feasibly that to decide slope stabilizing by curves of relative displacement between two sides of typical wake layer.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (54) PDF downloads(7) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return