Based on the engineering experience of cement-soil composite founlation, it becomes more and more acceptable to design composite foundation in accordance with settlement control. In this paper serveral problems are studied, which conclude varying parameters for composite foundation, determination of pile length in deep soft soil, selection of cushion.