Through modifying the current mechanical model and the current cumputational method of the stability of slurry trenchs in diaphram wall engineering,the improved parabolic cylinder model is put forward.The objective function based on the limit equilibrium theory is established and designed with the complex optimal method.The superiority of this method is proved by engineering practice.