The South-North Water Transfer Project (SNWTP) is a world-attracted giant trans-basin water transrer project.Studying it's risk is very necessary.There are lots of risk factors in it, such as engineering geology risks,engineering structural reliability risks,hydrology risks etc.These risks are summarized and the proper disposal measures are proposed. The risk analysis foreground view is given.