Luo Zhihu, Yang Pengfei. Rock-burst and Its Countermeasure of TBM Construction in Drainage Tunnel of a Hydropower station[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2009, 23(1): 52-55.
Citation: Luo Zhihu, Yang Pengfei. Rock-burst and Its Countermeasure of TBM Construction in Drainage Tunnel of a Hydropower station[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2009, 23(1): 52-55.

Rock-burst and Its Countermeasure of TBM Construction in Drainage Tunnel of a Hydropower station

  • Received Date: 2008-12-04
  • It had only been tunneled 1 027 m in previous 101 d in construction drainage tunnel of the Jinping Second cascade hydropower state. It had occurred 3 times rock-burst altogether in this period which immediately influence the tunneling process. The harm degree and the influence area of these rock-burst according to the time sequence which rock-burst occurred are discribed. The occurrence of rock-burst has certain regularity, which is not only related to high in-situ stress,but also related to the structural features of rock mass and the water conditions,etc. Simultaneity, the construction characteristic of TBM is also one of the factors which intensifying the occurrence of rock-burst. Utimately,it proposes the corresponding countermeasures by analysis for the occurrence regularity of rock-burst.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (91) PDF downloads(12) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return