Analyses the deformation mechanism of the pour landslide in the W200-W600 area of the north wall of Fushun west open pit with FLAC program of FEM for large deformation. Evaluates the effect of anti-slide pile and dewatering, provides the technical guidance and basis for engineeting design of slope treatment.