Volume 20 Issue 4
Jul.  2021
Turn off MathJax
Article Contents
ZHENG Jun-jie, HE Chun, LU Yan-er. Fuzzy Random Reliability of Prestressed Concrete Pipe Piles in Wuhan Area[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2006, 20(4): 194-196.
Citation: ZHENG Jun-jie, HE Chun, LU Yan-er. Fuzzy Random Reliability of Prestressed Concrete Pipe Piles in Wuhan Area[J]. GEOTECHNICAL ENGINEERING TECHNIQUE, 2006, 20(4): 194-196.

Fuzzy Random Reliability of Prestressed Concrete Pipe Piles in Wuhan Area

  • Received Date: 2006-04-18
    Available Online: 2021-07-06
  • Considering the randomness and fuzziness of the failure of piles, the settlement rate of piles is taken as a fuzzy random variable by using related theory of fuzzy mathematics. The membership function is determined by fuzzy statistical analysis of 42 static load tests of prestressed concrete pipe piles in Wuhan area. The probability formula and the calculation method of reliability index are derived by assuming the probability distribution of settlement rate and using the probability theory of fuzzy event. It provides reference for the judgment of failure of piles in engineering practice.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (56) PDF downloads(8) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return